Loading and Transportation of DRI Cooler Vessel
                            The project required the use of hydraulic trailers to load and move a large DRI cooler vessel, ensuring smooth transport despite the tight road conditions and size of the cargo.
                            
                            
                                Employees: 35
                                Progress: 90%
                             
                            PROJECT SCOPE
                            To find a custom solution to load and transport the complete fabricated vessel from the vendor yard to the port.
                            CHALLENGES FACED
                            The primary challenge was the need to transport a very large and heavy vessel through narrow roads and constrained spaces. Efficient coordination and precise handling were necessary to ensure safe transportation.
                            SOLUTION PROVIDED
                            Hydraulic multi-axle trailers were used for this operation. Two files of 15-axle conventional trailers with 540 HP ballasted trucks were used to load the cargo by using the self-jacking system of the trailers. This solution was crucial to navigate narrow roads and overcome other obstacles.